Cost and Time Efficiency

Accelerate your project delivery and reduce expenses with data-driven BIM workflows.

BIM accelerates project timelines and reduces unnecessary expenses by improving coordination, eliminating rework, and enabling better planning. Our workflows focus on maximizing efficiency across design, construction, and operations.

By leveraging the power of intelligent BIM models, we help you deliver projects faster and at lower cost, while maintaining or even improving quality standards.

Efficient BIM workflows using cloud data

How We Do It

  • Streamlined Workflows - We implement centralized, collaborative BIM platforms that reduce information silos and streamline communication between all project stakeholders.
  • Early Clash Detection - We identify and resolve design conflicts before construction begins, eliminating costly rework and schedule delays.
  • Resource Optimization - We leverage data-rich models and accurate quantity takeoffs to optimize resource planning and material usage throughout the project.
  • Cloud Collaboration - We shorten feedback loops and accelerate issue resolution through cloud-based collaboration tools that enable real-time communication.

The Impact on Your Bottom Line

Based on our client projects, here's how Cloud to BIM transforms efficiency:

28%
Average Reduction in Project Timeline

By streamlining workflows and eliminating rework, projects move from design to completion significantly faster.

22%
Typical Cost Savings

Through better coordination, clash avoidance, and optimized material usage, overall project costs are substantially reduced.

74%
Reduction in Rework

Early clash detection and coordination virtually eliminates the need for costly field rework during construction.

3.5x
ROI on BIM Investment

For every euro invested in our Cloud to BIM services, clients typically see a 3.5x return through cost savings and efficiency gains.

Before and After: The BIM Efficiency Transformation

Project Phase
Traditional Process
Cloud to BIM Process
Improvement
Design Development

Sequential design processes with lengthy review cycles and manual coordination between disciplines.

Parallel design development with real-time interdisciplinary coordination and automated clash detection.

42% Faster
Pre-Construction

Manual quantity takeoffs, frequent estimation errors, and limited visualization of construction sequences.

Automated material quantification, precise cost estimation, and detailed 4D construction simulations.

35% More Accurate
Construction

Frequent RFIs, on-site problem solving, unforeseen clashes, and scheduling conflicts.

Minimal RFIs, pre-resolved clashes, optimized scheduling, and digital field verification.

68% Fewer Delays
Handover

Paper-based documentation, incomplete as-builts, and disconnected facility information.

Comprehensive digital twin with integrated asset data and maintenance information.

85% More Complete

Why It Matters

Lower Overhead

Our approach reduces construction and coordination overhead by streamlining processes and eliminating redundancies throughout the project lifecycle.

Faster Delivery

Cloud to BIM workflows enable faster project delivery and significantly reduce delays by optimizing processes and improving coordination.

Better Resource Allocation

Our data-driven approach ensures better allocation of resources and manpower, eliminating waste and maximizing productivity.

Higher ROI

By implementing leaner project execution methods, we help you achieve higher ROI on both your BIM investment and overall project budget.

Data-driven BIM cost optimization

Success Story: Industrial Complex Renovation

A 15,000 m² industrial complex renovation faced tight budget constraints and an aggressive timeline. By implementing our Cloud to BIM approach:

€420K
Cost Savings

Through clash avoidance and optimized material usage

3 months
Schedule Reduction

By streamlining processes and improving coordination

92%
Fewer RFIs

Compared to similar projects using traditional methods

"The efficiency gains we experienced using MAW's Cloud to BIM approach were remarkable. Not only did we complete the project ahead of schedule, but we also came in significantly under budget. The ability to identify and resolve issues virtually before construction began was a game-changer for our team."

— Project Director, Industrial Renovation Project
Industrial Complex BIM Integration

Related Services

Ready to Boost Your Project Efficiency?

Discover how our Cloud to BIM approach can help you deliver projects faster and at lower cost. Contact us today to discuss your specific project needs.