Improved Coordination
Unify disciplines and align your project teams with sophisticated BIM coordination workflows.
BIM enables seamless coordination between architectural, structural, and MEP disciplines. Our improved coordination workflows ensure that all project stakeholders work from a unified model, reducing errors and optimizing collaboration.
When transforming point cloud data into BIM models, coordination becomes even more critical as we integrate existing conditions with new design elements. Our approach ensures alignment between reality capture data and design intent, creating a single source of truth for the entire project team.

How We Do It
- Model Federation - We bring together models from all design disciplines into a unified coordination model, allowing for comprehensive analysis and review.
- Clash Detection Routines - We implement systematic clash detection processes to identify and eliminate design conflicts early, before they impact construction.
- Coordination Meetings - We manage regular coordination meetings and issue resolution workflows with stakeholders to ensure alignment and swift problem-solving.
- Standardization - We establish and enforce standards for naming, versioning, and documentation to maintain traceability and model integrity throughout the project lifecycle.
Our Coordination Process
A systematic approach to ensure all disciplines work in harmony:
Reality Capture & Data Processing
We capture existing conditions through laser scanning and process the point cloud data to create an accurate foundation for coordination.
Model Creation & Definition
We develop discipline-specific models based on the point cloud data, ensuring each model follows established protocols and standards.
Model Federation & Clash Detection
We combine all discipline models into a federated model and perform systematic clash detection to identify and resolve conflicts.
Issue Tracking & Resolution
We implement a structured issue management system to document, assign, and track the resolution of all coordination issues.
Coordination Meetings & Decision Documentation
We facilitate regular coordination meetings to review issues, make decisions, and document the resolution process for future reference.
Coordination Platforms We Use
Autodesk BIM 360
Cloud-based platform for model hosting, version control, and issue tracking, enabling real-time collaboration between all stakeholders.
- Central model repository
- Version comparison
- Mobile accessibility
- Permission control
Navisworks Manage
Powerful coordination tool for model aggregation, clash detection, and issue management with advanced analysis capabilities.
- Comprehensive clash detection
- Clash grouping & reporting
- 4D simulation
- Model review tools
Revizto
Issue tracking and visualization platform that creates an immersive environment for identifying and resolving coordination problems.
- Interactive 3D environment
- Cross-platform issue tracking
- VR capabilities
- Real-time collaboration
Solibri Model Checker
Advanced quality assurance tool that validates models against rules and requirements, ensuring comprehensive coordination.
- Rule-based checking
- Information takeoff
- Classification verification
- Detailed reporting
Autodesk Collaboration for Revit
Real-time multi-user Revit collaboration platform that enables concurrent work on the same model across different locations.
- Worksharing monitor
- Cloud-based collaboration
- Centralized model access
- Design communication tools
BCF Manager
Open standard-based issue tracking using BIM Collaboration Format (BCF) for seamless exchange of coordination information between platforms.
- Platform-neutral format
- Open workflows
- Visual issue communication
- Interoperability
Why It Matters
Fewer On-Site Issues
Our improved coordination process dramatically reduces the number of on-site issues caused by design misalignment or overlapping systems, preventing costly rework.
Faster Issue Resolution
Real-time collaboration and model-based issue tracking enable faster problem identification and resolution, keeping your project on schedule.
Smoother Integration
Our coordination approach ensures seamless integration between design, engineering, and construction teams, creating a more collaborative project environment.
Better Performance
Improved coordination leads to better overall project performance across schedule, budget, and quality benchmarks, resulting in more successful project outcomes.

Coordination Success Story: Commercial Complex Renovation
A 12,000 m² commercial complex renovation required extensive coordination between existing conditions and new design elements. Our cloud to BIM coordination approach delivered remarkable results:
Before construction documents were issued
Through streamlined coordination process
Compared to similar projects without coordination
"The level of coordination that MAW achieved on our complex renovation project was unprecedented. By creating an accurate BIM model from our existing building's point cloud data and implementing a rigorous coordination process, they eliminated countless potential conflicts before construction began. This approach saved us significant time and money while ensuring a smoother construction process."

Related Services
Ready to Improve Your Project Coordination?
Transform your project delivery with our advanced BIM coordination workflows. Contact us today to discuss how we can help your team collaborate more effectively and deliver better results.